The meeting focused on planning for the NAB (National Association of Broadcasters) show, with Yasser leading the discussion while JT was unable to attend due to travel. The team reviewed the booth layout, including the addition of an extra table for SVTA demos, and discussed equipment needs such as TVs and monitors. They addressed the requirement for exhibitor badges to access the floor early and confirmed that Bill, Yasser, and Dean would need these badges. The group also talked about logistics for equipment delivery, scheduling meetings with influential visitors, and content preparation for demos. Yasser mentioned that JT would be sharing demo links and an executive briefing, while a PR would be distributed on Monday for review and feedback.
Â
- Yasser: Send email to Lindsey with feedback and notes from the meeting for Lindsey to incorporate and send to JT
- Dean and Yasser: Talk offline (after the call) about the demo page and determine what is needed for SVT
- Dean: Provide his name to Yasser for the exhibitor badge list
- JT: Send demo links to everyone today to finalize their content
- Dean and Yasser: Talk early next week about what to put on the demo page/website
- JT: Share executive briefing today for review or comments
- JT: Share PR on Monday for review and feedback, and distribute on Wednesday
- Bill: Share logistics details and coordinate with JT and relevant team members regarding equipment delivery timing at the loading dock in Vegas
- Bill: Ensure the right people are available by cell phone to coordinate equipment delivery when the truck arrives in Vegas
- Lindsey: Incorporate Yasser's feedback/notes into the main notes and send to JT
- Feedback to JT and JT’s Responses
(Good Friday- only SCTE and Interdigital present):
- Questions on Booth layout
- Spot in the middle dropping power?
- Square is literature stands ? ( Literature/ membership)
- JT’s response: yes middle is power drop, yes squares are literature stands.
- TV Situation?
-
- UHDF 4 to be brought 9 But no rack)
- Interdigital bringing additional monitor for laptop output
- 5th Table has an NAB Order for the TV
- JT’s response: No one need a rack. One TV/table.
- Locking Cabinet/ Coffee machine/ Signage
-
- Locking Cabinet is smaller table
- Signage is skinny rectanges
- Tabletop has signage with Bar Codes
- JT’s response: Yes. Locking cabinet is table. I will label everything on the floor plan.
- 5G setup? As convention cranks up it might be less reliable. What is each Demo’s risk in this?
-
- SCTE- Should be able to operte
- Interdigital- Not exposed
- Others?
- JT’s response: 5G should be fine for anyone that needs internet
- Dolby- Can provide some content material.
- JT’s response: Dolby has provided content. I will share links with details.
- Booth Maintenance on Floor ( Do we need to do something here?)
-
- Buy a cheap vacuum or order from NAB staff
- JT’s response: We have already contracted vacuum services.
- Europe on Monday will be on Holiday so maybe not enough time to review PR .
- JT’s response: Good point. Let’s push to release Thursday.
- How to set up meetings if needed. Â How to inform demo booth people as well?
- JT’s response: Honestly this is up to the individual demo companies. There will be a form on each demo page going to the email address provided to me. You can use this and whatever other channels and means you want. EVERY social post will mention these demo pages + form
- Need to set up logistics on receiving equipment ( Like Friday Afternoon). Has to occur before loading dock closes for the evening. Â What is backup/ Interdigital Truck from Culver City on Friday morning. If truck is on time everything is smooth. If late and closing docks closes then delivers Saturday Morning. Â Need right people on cell phone to let know when truck is getting close.
- JT’s response: I will be onsite Friday morning. My cell phone is good.
- Are there other demo people shipping equipment?
-
- SCTE- No
Updates:
- Sending demo links to everyone today to finalize their content
- Who to send to for SCTE and What?
- need list of people for exhibitor badges (Valerie provided interdigital’s)
- social campaign to start on Tuesday and continue non stop through NAB
- Executive briefing to be shared today for review/comments. To whom did you distribute this previously?
- People involved with demos and board ( Marta managed with ben previous). Refer to JT/Ben email to for distribution
- PR will be shared on Monday for review/feedback and distributed on Wednesday
- Does that include the piece to send to NAB for publication?
Booth Layout:
https://lucid.app/lucidspark/4bbc047f-6bde-4850-8c03-f06911feaf99/edit?viewport_loc=-880%2C-505%2C1259%2C825%2C0_0&invitationId=inv_c2cf89b0-8833-445a-882b-2bdd93f7f023
- Antitrust Statement & Holiday Scheduling Challenges Discussion
- The team discussed scheduling challenges due to the holiday weekend, with Yasser noting that JT was unable to attend due to travel and the timing conflicting with European participants.
- Dean suggested rescheduling to a time when JT could join.
NAB Booth Preparations Discussion
- Yasser and Dean discussed preparations for NAB, focusing on booth logistics and attendance.
- They identified the need for exhibitor badges for early access and discussed potential attendees, including Paul Hardy and others from DVS.
- Yasser reviewed the booth layout, noting questions about additional tables for SVTA demos and the placement of literature stands.
- Bill provided insights on the layout, clarifying the purpose of literature stands and suggesting that handouts might not be necessary for demo discussions.
Event Logistics Planning Meeting
- Yasser and Bill discussed the logistics for an upcoming event, including the number and type of TVs being brought.
- Bill clarified that four Ultra HD Forum TVs would be brought without the rack, along with an additional monitor for PowerPoint presentations.
- Yasser confirmed that JT was ordering another table and TV for the fifth display.
- They also addressed questions about a locking cabinet, coffee machine, and signage, with Bill explaining the locations and types of signage needed.
5G Setup for Convention Planning
- Bill and Yasser discussed the 5G setup for an upcoming convention, with Jason bringing the equipment.
- They expressed concerns about reliability as the convention progresses and agreed to have backup plans, including discussing interdigital and SCTE topics.
- Bill confirmed they are not exposed to 5G risks and use demo-on-a-stick presentations.
- Yasser mentioned that Dolby might provide some soccer game footage content.
Booth Layout and Campaign Planning
- Yasser discussed booth layout details, including badge requirements and the Dolby logo placement.
- JT was tasked with sending demo links to everyone for content finalization, with Dean and Yasser planning to discuss the web content early next week.
- The social campaign was scheduled to start on Tuesday and run through NAB, and an executive briefing was to be shared for review and comments, with distribution to demo participants and the board.
PR Distribution and Booth Planning
- The team discussed PR distribution plans, with Ben confirming a PR would be shared on Monday for review and distributed on Wednesday.
- Bill noted timing challenges for European offices due to the Tuesday start time and Wednesday distribution.
- The discussion also covered booth management procedures, including how to inform demo staff about important visitors and coordinate SVTA demos.
- Yasser agreed to send the feedback to Lindsey for incorporation into notes for JT.
Equipment Delivery Logistics Planning
- The team discussed logistics for equipment delivery, with Bill explaining that the truck needs to arrive by Friday evening before the loading dock closes, or it will be redirected to Culver City and potentially deliver on Saturday morning instead.
- Yasser confirmed they are only bringing laptops and don't need to worry about shipping, with backup laptops available if needed.
- The team agreed to coordinate via phone to ensure proper timing for the delivery.
Next Meeting: Friday, April 10, 2026 7am PDT